Prior to works commencing, we set up a ground cordon with ground marshal around the defective glazing to ensure the safety of the general public and building occupants during our works.
Given the height of the glazing, our PASMA trained Technicians erected two scaffold towers either side of the defective glazing to allow us access during the removal and installation process.
With replacement glazing units weighing over 400KG we utilised specialist glass suction lifting equipment and a UNIC spider crane to allow for the existing glass to be safely removed for disposal and the careful installation of replacement glazing.
Once the replacement was correctly installed, we cleared away materials and removed our access equipment to hand over a clean works area to the client.